Informational Guide to Mumbai Airport (BOM) - Non Official

SG116 SpiceJet - Flight Status

Below, you can find details about SpiceJet flight SG116, which currently operates between the airports of Darbhanga - Darbhanga Airport (Airport Code DBR) and Mumbai - Mumbai Chhatrapati Shivaji International Airport (Airport Code BOM).
This flight data pertains specifically to the flight's details for Monday, May 25, 2026.

SG116 On Time performance:
19
We have calculated the percentage of flights that arrived within 15 minutes of their scheduled time, or earlier, based on real flight data from the last 3 months. More about punctuality and delays

Flight Status

SG116 SpiceJet from Darbhanga

Scheduled - On-time
Flight Status for Monday May 25, 2026

Airline information

SpiceJet
SpiceJet
Equipment: Boeing 737-800 (winglets) Passenger/BBJ2

Departure

Darbhanga (DBR)
May 25, 2026
Darbhanga Airport
Estimated Departure Time:
10:50
Terminal:
1
Gate:
-
Scheduled Departure Time: 10:50

Arrival

Mumbai (BOM)
May 25, 2026
Mumbai Chhatrapati Shivaji International Airport
Estimated Arrival Time:
13:45
Terminal:
1
Gate:
-
Scheduled Arrival Time: 13:45
Disclaimer
The information displayed on this website is gathered from third-party providers with a wide reputation on the sector, which in turn obtain the information from the airlines. This data is provided only for informative purposes. www.mumbaiairport.com assumes no responsibility for loss or damage as a result of relying on information posted here. Please contact your airline to verify flight status.

Additional Information

Which is the frequency of flight SG116?
The flight SG116 is scheduled to flight on Monday, Tuesday, Wednesday, Thursday, Friday, Sunday on a weekly basis.

Which is the distance of flight SG116?
The distance between the two airports is 1553 kilometers.

Which is the flight time of flight SG116?
The scheduled flight time gate to gate is: 02:55 hours.
The real flight time gate to gate on average is: 02:50 hours.

Are the departure airport and arrival airport at the same Time Zone?
Yes, both airports are in the same timezone.

Alternative Flights

The following airlines serves the same route between Darbhanga and Mumbai:

IndiGo
- Flight Number: 6E536. (On Time performance: 68 - Average Delay: 11 minutes)

Akasa Air
- Flight Number: QP1140. (On Time performance: 39 - Average Delay: 26 minutes)

Punctuality and delays

We have gathered data from recent months and present below an analysis of how timely the flights have been.

In terms of On-Time Performance, by analyzing the flight data from the last three months, spanning from March 29, 2026 to May 22, 2026, we have obtained these figures.
Total number of flights: 47
On Time: 9 ( 19 % )
Moderate Delay: 5 ( 11 % )
Significant Delay: 11 ( 23 % )
Major Delay: 22 ( 47 % )
Canceled: 0 ( 0 % )
Diverted: 0 ( 0 % )

Average Delay: 68 minutes.
Delays analyzed by Weekday: We have gathered available data from last six months, spanning from March 29, 2026 to May 22, 2026. Next, you can observe the results broken down by day of the week: number of flights analyzed, on-time performance per day, and average delay per day.

Delays analyzed by Month: We have gathered available data from last twelve closed months, spanning from May 02, 2025 to April 30, 2026. Next, you can observe the results broken down by month: number of flights analyzed, on-time performance per month, and average delay per month.

Note: We have excluded some months from the graph, since the quantity and quality of the data is not representative enough.

Last Past Flights SG116

Date
Departure
Arrival
Duration
Aircraft
Status
Sunday
24 May
11:15
Darbhanga (DBR)
13:45
Mumbai (BOM)
02h 30min
Boeing 737-800
Boeing 737-800
Landed - On-time
Friday
22 May
13:10
Darbhanga (DBR)
16:05
Mumbai (BOM)
02h 55min
Boeing 737-800
Boeing 737-800
Landed - Delayed
Thursday
21 May
12:15
Darbhanga (DBR)
15:10
Mumbai (BOM)
02h 55min
Boeing 737-800
Boeing 737-800
Landed - Delayed
Wednesday
20 May
11:25
Darbhanga (DBR)
14:35
Mumbai (BOM)
03h 10min
Boeing 737-800
Boeing 737-800
Landed - Delayed
Tuesday
19 May
11:09
Darbhanga (DBR)
13:51
Mumbai (BOM)
02h 42min
Boeing 737-800
Boeing 737-800
Landed - On-time
Monday
18 May
11:00
Darbhanga (DBR)
13:45
Mumbai (BOM)
02h 45min
Boeing 737-800
Boeing 737-800
Landed - On-time
Sunday
17 May
10:54
Darbhanga (DBR)
13:51
Mumbai (BOM)
02h 57min
Boeing 737MAX
Boeing 737MAX
Landed - On-time
Friday
15 May
10:54
Darbhanga (DBR)
13:30
Mumbai (BOM)
02h 36min
Boeing 737-800
Boeing 737-800
Landed - On-time
Thursday
14 May
11:12
Darbhanga (DBR)
13:50
Mumbai (BOM)
02h 38min
Boeing 737-800
Boeing 737-800
Landed - On-time
Wednesday
13 May
13:50
Darbhanga (DBR)
16:48
Mumbai (BOM)
02h 58min
Boeing 737MAX
Boeing 737MAX
Landed - Delayed