SG113 SpiceJet - Flight Status
Below, you can find details about SpiceJet flight SG113, which currently operates between the airports of Mumbai - Mumbai Chhatrapati Shivaji International Airport (Airport Code BOM) and Darbhanga - Darbhanga Airport (Airport Code DBR).
This flight data pertains specifically to the flight's details for Thursday, November 05, 2026.
Table of contents:
Flight Status Additional Information Alternative Flights Punctuality and delays Last Past Flights SG113
Flight Status Additional Information Alternative Flights Punctuality and delays Last Past Flights SG113
SG113 On Time performance:
43
We have calculated the percentage of flights that arrived within 15 minutes of their scheduled time, or earlier, based on real flight data from the last 3 months. More about punctuality and delays Flight Status
SG113 SpiceJet to Darbhanga
Scheduled - Delayed
Delay: 185 minutes
Flight Status for Thursday November 05, 2026
Scheduled - Delayed
Delay: 185 minutes
Flight Status for Thursday November 05, 2026
Departure
Mumbai (BOM)
November 05, 2026
Mumbai Chhatrapati Shivaji International Airport
Estimated Departure Time:
12:20
Terminal:
1
Gate:
-
Scheduled Departure Time: 09:15
Arrival
Darbhanga (DBR)
November 05, 2026
Darbhanga Airport
Estimated Arrival Time:
14:55
Terminal:
-
Gate:
-
Scheduled Arrival Time: 11:50
Disclaimer
The information displayed on this website is gathered from third-party providers with a wide reputation on the sector, which in turn obtain the information from the airlines. This data is provided only for informative purposes. www.mumbaiairport.com assumes no responsibility for loss or damage as a result of relying on information posted here. Please contact your airline to verify flight status.
Additional Information
Which is the frequency of flight SG113?
The flight SG113 is scheduled to flight on Monday, Wednesday, Thursday, Friday, Saturday, Sunday on a weekly basis.
Which is the distance of flight SG113?
The distance between the two airports is 1553 kilometers.
Which is the flight time of flight SG113?
The scheduled flight time gate to gate is: 02:35 hours.
The real flight time gate to gate on average is: 02:38 hours.
Are the departure airport and arrival airport at the same Time Zone?
Yes, both airports are in the same timezone.
The flight SG113 is scheduled to flight on Monday, Wednesday, Thursday, Friday, Saturday, Sunday on a weekly basis.
Which is the distance of flight SG113?
The distance between the two airports is 1553 kilometers.
Which is the flight time of flight SG113?
The scheduled flight time gate to gate is: 02:35 hours.
The real flight time gate to gate on average is: 02:38 hours.
Are the departure airport and arrival airport at the same Time Zone?
Yes, both airports are in the same timezone.
Alternative Flights
The following airlines serves the same route between Mumbai and Darbhanga:
IndiGo
- Flight Number: 6E2664. (On Time performance: 80 - Average Delay: 10 minutes)
- Flight Number: 6E535. (On Time performance: 78 - Average Delay: 8 minutes)
Akasa Air
- Flight Number: QP1139. (On Time performance: 90 - Average Delay: 2 minutes)
IndiGo
- Flight Number: 6E2664. (On Time performance: 80 - Average Delay: 10 minutes)
- Flight Number: 6E535. (On Time performance: 78 - Average Delay: 8 minutes)
Akasa Air
- Flight Number: QP1139. (On Time performance: 90 - Average Delay: 2 minutes)
Punctuality and delays
We have gathered data from recent months and present below an analysis of how timely the flights have been.
Delays analyzed by Week: It is not possible to calculate the On-Time Performance for this flight accurately by weekday due to insufficient or non-representative data, as doing so could lead to misleading conclusions
Delays analyzed by Month: We have gathered available data from last twelve closed months, spanning from October 25, 2026 to October 31, 2026. Next, you can observe the results broken down by month: number of flights analyzed, on-time performance per month, and average delay per month.
In terms of On-Time Performance, by analyzing the flight data from the last three months, spanning from October 25, 2026 to November 01, 2026, we have obtained these figures.
Total number of flights: 7
On Time: 3 ( 43 % )
Moderate Delay: 1 ( 14 % )
Significant Delay: 0 ( 0 % )
Major Delay: 3 ( 43 % )
Canceled: 0 ( 0 % )
Diverted: 0 ( 0 % )
Average Delay: 79 minutes.
Total number of flights: 7
On Time: 3 ( 43 % )
Moderate Delay: 1 ( 14 % )
Significant Delay: 0 ( 0 % )
Major Delay: 3 ( 43 % )
Canceled: 0 ( 0 % )
Diverted: 0 ( 0 % )
Average Delay: 79 minutes.
Delays analyzed by Month: We have gathered available data from last twelve closed months, spanning from October 25, 2026 to October 31, 2026. Next, you can observe the results broken down by month: number of flights analyzed, on-time performance per month, and average delay per month.
Last Past Flights SG113
Date
Departure
Arrival
Duration
Aircraft
Status
Wednesday
04 November
04 November
13:15
Mumbai (BOM)
Mumbai (BOM)
16:00
Darbhanga (DBR)
Darbhanga (DBR)
02h 45min
Boeing 737-800
Boeing 737-800
Landed - Delayed
Monday
02 November
02 November
09:15
Mumbai (BOM)
Mumbai (BOM)
11:50
Darbhanga (DBR)
Darbhanga (DBR)
02h 35min
Boeing 737 Pas
Boeing 737 Pas
Sunday
01 November
01 November
09:15
Mumbai (BOM)
Mumbai (BOM)
11:50
Darbhanga (DBR)
Darbhanga (DBR)
02h 35min
Boeing 737 Pas
Boeing 737 Pas
Saturday
31 October
31 October
09:15
Mumbai (BOM)
Mumbai (BOM)
11:50
Darbhanga (DBR)
Darbhanga (DBR)
02h 35min
Boeing 737-800
Boeing 737-800
Friday
30 October
30 October
11:58
Mumbai (BOM)
Mumbai (BOM)
14:40
Darbhanga (DBR)
Darbhanga (DBR)
02h 42min
Boeing 737-800
Boeing 737-800
Landed - Delayed
Thursday
29 October
29 October
13:12
Mumbai (BOM)
Mumbai (BOM)
15:46
Darbhanga (DBR)
Darbhanga (DBR)
02h 34min
Boeing 737-800
Boeing 737-800
Landed - Delayed
Wednesday
28 October
28 October
10:10
Mumbai (BOM)
Mumbai (BOM)
12:40
Darbhanga (DBR)
Darbhanga (DBR)
02h 30min
Boeing 737-800
Boeing 737-800
Monday
26 October
26 October
10:55
Mumbai (BOM)
Mumbai (BOM)
13:40
Darbhanga (DBR)
Darbhanga (DBR)
02h 45min
Boeing 737-700
Boeing 737-700
Landed - Delayed
Sunday
25 October
25 October
09:05
Mumbai (BOM)
Mumbai (BOM)
11:30
Darbhanga (DBR)
Darbhanga (DBR)
02h 25min
Boeing 737-700
Boeing 737-700
Landed - Delayed
